Condo bathroom leaking downstairs
Stripped the old tiles, new waterproofing across the floor, a flood test, then retiled with separate wet and dry zones.


Sample illustration: two different CC0 stock photos, not a real transformation. Replace with your own before/after photos.
The problem
Building management reported water coming through the ceiling below; the owner had 30 days to fix it.
What we did
- 1Filed the building request within 2 days
- 2Waterproofed the floor and 30 cm up the walls; 24-hour flood test
- 3New tiles and a glass shower screen
The result
No more water downstairs; management signed it off. (Sample text — write your job's real outcome.)





